Live record

Public build log

Watch the site become what it claims.

The repository history is the detailed record. This page translates the major builds into plain language, including what is still missing.

GAJRA Earth Build Log

Build 0 - Reconnaissance - 27 July 2026

  • Selected `GAJRA-earth-infinity` as a separate build repository so the established `GAJRA-earth` repository remains intact.
  • Mapped the connected public projects, local-first builders and source trails.
  • Separated visible facts, open questions and proposed work.

Build 1 - The public spine - 27 July 2026

  • Created a multi-page replacement while leaving `gajra.earth` unchanged during review.
  • Kept the established `GAJRA-earth` repository separate.
  • Added grouped desktop and mobile navigation, a sitemap, a reality layer and this public build log.
  • Added the persistent 0-100 Motion Vibrancy control as a site-wide system.
  • Kept the Strange But True Public Source Licence with all commercial rights reserved.
  • Published early so later visual, interactive and research work will have a visible history.
  • Published from a dedicated repository before moving the `gajra.earth` domain.

Build 2 - Earth in view - 27 July 2026

  • Added NASA SVS 31375 aurora footage and a locally optimised poster with direct source credit and no endorsement claim.
  • Added original flower-force artwork made for the project, plus a 178 KB web delivery version.
  • Connected video playback to Motion Vibrancy: motion 0 pauses it, while a visitor's own pause remains respected.
  • Added source-specific captions that distinguish observed Earth imagery, symbolic artwork and future simulations.
  • Removed the synthetic vector-like Earth treatment; real Earth now appears only through credited raster imagery.
  • Restored the original Aura heart logo and browser icons from the supplied GAJRA build.
  • Made the section seams span the full viewport and made the ticker loop without an empty interval.
  • Reframed the site around new and seasoned explorers mapping infinity.
  • Added a unique full-width hero image to every room.
  • Added a punctuation check that rejects em dashes.
  • Clarified the home diagram as our Sol system with Sol, eight named planets and a real NASA raster for Earth.
  • Gave ticker words wider spacing and RGB accents, with slower counter-moving colour rails.
  • Replaced the moving seam slug with colour flowing through the full kintsugi line.
  • Added motion-aware pointer light and centre-balanced card tilt for mouse and touch, following the Right Place Right Time interaction.
  • Removed permanent media credit panels. Full-width imagery now carries reusable hover, focus and tap acknowledgements behind small information icons.
  • Moved the Earth aurora film directly below the ticker, removed the linear planet key and slightly quickened the labelled Sol model.
  • Left `gajra.earth` unchanged while this dedicated Pages site remains the public build preview.

Build 3 - The local Alignment Lab - 27 July 2026

  • Turned the Alignment Lab spine into a working browser-local instrument.
  • Connected four revisable parts: a JRA map, preference comparison, lived experiment and source card.
  • Kept local saving explicit. Unsaved words stay only in the open tab, and saved words remain in that browser.
  • Added readable Markdown, structured JSON and single-record JSONL downloads.
  • Labelled downloads as personal records or raw contribution material, not automatically valid training datasets.
  • Added keyboard-operable instrument tabs, visible focus, mobile layouts and a completion trace.
  • Added an automated privacy guard that rejects network transmission APIs in the Lab script.
  • Replaced the darker home film with NASA SVS 31281, a brighter Aurora Australis sequence that ends with Australia and Perth in view.
  • Lifted the base reading size, card headings, labels and supporting text across the site.
  • Added clearer screen-reader descriptions for the Sol model, media, local-save state and download controls.
  • Strengthened heading and landmark structure so the site reads in a meaningful order without its visual layout.
  • Reworked the header and footer at laptop widths so the full organisation name, navigation and page links no longer collide.
  • Changed the grouped navigation into an accordion so opening one section closes the others.
  • Replaced the plain diagram on the first concept hero with a rich original raster artwork.

Build 4 - Borderless atlas foundation - 27 July 2026

  • Replaced the static Ecosystem page hero with a working satellite atlas.
  • Added sphere and flat view controls with no geolocation prompt.
  • Used neutral Sentinel-2 cloudless imagery rather than OpenStreetMap tiles or a political boundary layer.
  • Added a no national flags map policy in the public map data.
  • Published one broad build-origin record and no joined-group claims.
  • Added a screen-reader-accessible public records ledger below the map.
  • Added guardrail checks for unwanted map tile sources, geolocation requests and forbidden flag-related map chrome.
  • Vendored MapLibre GL JS assets and licence text so the map engine is visible in source and not loaded from a live CDN.

Build 5 - Pruned public journey - 27 July 2026

  • Reduced the main public navigation to eight useful doors: Home, Meeting Space, Alignment Lab, Gather, Bridge Atlas, Frontier Labs, Culture and Build With Us.
  • Preserved old room URLs as lightweight redirect trails into the nearest useful room.
  • Moved the JRA definition and small commitment loop into the Meeting Space.
  • Moved Data Garden, Simulations and Live Experiments into the Alignment Lab as one source-and-edge-walk workbench.
  • Added starter field-kit lanes to Gather: listening stations, tech help and festival host markers.
  • Moved AI-builder hedge language and technical map-layer planning into Frontier Labs.
  • Moved Earth-to-Sol stewardship and source trails into Culture.
  • Moved atlas joining, status, archive and build utility paths into Build With Us.

Build 6 - Plain core and public stakes - 27 July 2026

  • Stated the front-page purpose in clear language: GAJRA Earth convenes a meeting of minds about self-alignment and AI alignment within Joyful Responsible Abundance.
  • Added a plain-language explanation of self-alignment and AI alignment before the more poetic site layers.
  • Added a source-backed homepage section on why this matters now: money, current AI safety rooms, frontier-industry coordination, AI-for-good spaces and the missing middle.
  • Framed the stakes as practical and lived: work, education, health, media, culture, trust, ecology, security, agency and ordinary days.

Build 7 - Meeting and field-kit handles - 27 July 2026

  • Reworked the Meeting Space so it begins with a browser-local meeting-circle builder instead of only a metaphor.
  • Added copy, Markdown download, calendar file, email draft and WhatsApp draft actions for meeting invitations.
  • Reworked Gather so it begins with a practical starter field-kit builder for listening stations, tech-help tables, public circles and festival tables.
  • Added the same local handoff actions for field-kit run sheets.
  • Pointed the homepage primary action and cards at the new functional anchors.
  • Kept the pattern browser-first: nothing is sent by the page, and the visitor chooses any email or messaging handoff.
  • Added validation checks so the meeting builder, field-kit builder, local handoff script and no-network rule remain present after future builds.

Build 8 - What is approaching - 28 July 2026

  • Added a source-led future watch inside Gather for events people may attend, influence or watch.
  • Kept the watch separate from the page hero and from reports about events that have already happened.
  • Added filters for participation routes, plain search and a visible count of matching opportunities.
  • Added calendar downloads that preserve the organiser's live page as the place to confirm current details.
  • Seeded the first watch with official ITU, AI for Good and UN sources, with the date each record was checked.
  • Added a question to carry into each room so an event listing can become preparation rather than passive promotion.
  • Labelled listings as invitations to inspect, not GAJRA Earth endorsements.
  • Added automated checks for source links, participation routes, calendar support and accidental network transmission.
  • Replaced the long underlined section links with compact action tiles that keep each label and arrow together.
  • Cut the Meeting Space from six explanatory sections to one invitation builder and two useful onward paths.
  • Reduced the meeting form to the details required to invite people, hold the question and name the shared trace.
  • Centred editorial sections in a calmer reading column and brought section numbers back beside their headings.
  • Reduced Gather to one job: build a GAJRA Field Kit.
  • Removed the future-events watch, explanatory sequence and secondary cards from the Field Kit journey.
  • Unified the promise, builder, preview and exports around one Field Kit instead of mixing rooms, listening stations and run sheets.

Build 9 - One door, one useful job - 28 July 2026

  • Rebuilt the public journey around eight active doors: Home, Alignment Lab,

Meeting Circle, Field Kit, Bridge Atlas, Future Watch, Culture Compass and

Join or Build.

  • Gave every door a private page contract naming its visitor, task and useful

outcome.

  • Removed automatic essays, repeated questions, generic sequence panels and

unrelated onward cards from the active pages.

  • Rebuilt the layout around one centred frame, one editorial width and one

reading measure, with compact heroes and content-sized cards.

  • Repaired the missing prompt grid, laptop header conflicts, mobile no-script

navigation, anchor offsets and footer flow.

  • Added the browser-local Culture Compass and contribution packet with copy,

download and explicit message handoffs.

  • Made the Alignment Lab instruments optional and changed its state summary

from a completion percentage to an answered-field count.

  • Strengthened Meeting Circle and Field Kit calendar exports with validation,

end times and blank-recipient email drafts.

  • Moved Future Watch into its own useful door and retained source, date,

participation filters and calendar export.

  • Rechecked all six Future Watch records against official organiser pages,

added direct event links and removed calendar export where only a month is known.

  • Replaced the weakest procedural hero fields with original cinematic raster

scenes for Alignment Lab, Field Kit, Future Watch and Join or Build.

  • Kept the home aurora immediately below the ticker and kept the functional

Bridge Atlas separate from its Earth-view hero.

Next builds

  • Build 10: useful map layers for festivals, working groups, labs, data centres,

grant labs, tender labs and starter field kits.

  • Build 11: expand the static review workflow from local contribution packets

into vetted Atlas records.