Planning laboratory · Costs, income and shared resources

Make the
numbers speak.

Compare an illustrative operating model, the existing lease reference and an optional compute scenario, each in its own terms.

System in development · Brisbane · 8 November 2026

Suburban rooftops with solar panels in Canberra, photographed on 7 February 2026.

Image credit ↗

An editable operating scenario

Give each cost and income stream a home.

A shared establishment can combine provider contributions, commissioned programmes, memberships and other agreed funding. Compare those amounts with the people, premises and continuing service they support.

The starting inputs below are illustrative scenario values. They describe neither a proposed lease offer nor committed funding. Keep the initial cash needed for setup visible alongside the annualised planning reserve.

Keep your inputs on this device or take a scenario to another conversation.

Premises, people and proposed income

Ordinary financial records carry wages, services, equipment and premises costs.

Your working scenario

A$524,000

annual funding gap under the stated assumptions

Annual premises contribution
A$300,000
Annual loaded staffing cost
A$800,000
Annual recurring operating costs
A$1,280,000
Annualised setup / renewal allowance
A$60,000
Total annual planning requirement
A$1,340,000
Proposed annual income
A$816,000
Member contributions within that income
A$216,000
Total paying members to balance this scenario
1,028
Scenario surplus
A$0
Annual requirement = premises + staffing + other operations + setup capital ÷ chosen years.
Income = proposed programme income + members × monthly contribution × 12.
Gap = max(0, requirement − income).

A cash-flow forecast must also place deposits, setup payments, receipts and reserves in their actual months. Grants, debt, guarantees, in-kind support and service income have distinct effects.

Existing lease reference

Keep the QPS commitment in its own account.

The CCC report records a starting annual lease figure of A$5.8 million, flat 4% annual indexation and a 15-year term. This reference calculator shows the arithmetic by lease year.

Lease year and indexed amount

Year 1 uses the starting amount. Each following year applies the stated increase.

Your working scenario

A$522,773

monthly reference amount for the selected lease year

Annual reference amount
A$6,273,280
Sum across the stated term
A$116,136,808
Annual amount in year n = base × (1 + rate)n−1.
Monthly reference = annual amount ÷ 12.
Term sum adds each indexed annual amount.

This reference is distinct from the amount a civic operator might agree to contribute. It does not establish a community tenancy, current invoice or sublease entitlement.

CCC Investigation Sphynx, November 2026, timeline entry at PDF page 21.

Optional technical module

Compute needs its own workload and site case.

The Missing Middle plan uses A$6 million as an initial installed node allowance. Use this separate module to explore one technical scenario; it is not automatically added to the civic operating model.

Compute capital and energy

Rated IT power, average utilisation and facility overhead are separate inputs.

Your working scenario

A$6,000,000

initial infrastructure capital in this optional scenario

Average facility load · kW
86.4
Annual energy · kWh
756,864
Annual energy charge at stated rate
A$189,216
Average power = nodes × rated IT kW × utilisation × facility ratio.
Annual energy = average kW × 8,760 hours.
Energy charge = annual kWh × A$/kWh.

Site power, cooling, loading, handling, fibre and the actual workload determine the installation. This scenario uses authored planning assumptions rather than a specification or current supplier quote.

Installing the Missing Middle: economics · Sovereign Capacity Lab.

Different accounts, different purposes

Three A$6 million figures can mean different things.

FigureBasisWhat belongs in this model
Approximately A$6m a yearRounded reference at A$500,000 a month for the whole property.Use the lease-reference module for indexed amounts and dates.
A$6m initial capitalThe authored installed-compute-node planning allowance.A selected technical module with its own capital and operating case.
A$6m annual programme guide500 Queens: A$5m enterprise grants plus A$1m incubator operations, using rounded 2021 inputs.Update the local programme costs; keep enterprise grants separate from premises and staffing.

C-Hour recognises voluntary human time. Community-chosen thanks and reciprocity sit alongside the financial accounts and the record of actual outcomes.