Sovereign Capacity LabAtoms to useful capability
Concept of a scientific notebook, specimen, balance and microscope in a materials research library.

A Fair Go in the Age of Superintelligence

Evidence assumptions and reproducible methods

Inspect the dated sources, the calculation boundaries and the relationships between the projects.

AI-generated concept image · 7 November 2026 · Image credits and prompt

Research and default assumptions dated

Power allocation comes before deployment

Reserve new clean electricity for fossil replacement, essential development and replacement of retired clean supply. The remaining annual energy can support additional compute and robots. The model reports gaps in both protected allocations and new project supply. It does not assume UN Sustainable Development Goals or clean-energy transition targets give way to machines.

Annual energy is a first check. Dependable delivery needs hourly demand, weather, storage power and duration, network limits and outages. The repeated-day solar illustration tests a simplified day; it is not a weather or grid reliability model. Storage losses are charged at the source. Storage is not counted as generation.

Units and boundaries

One gigawatt sustained for a year supplies 8.76 terawatt-hours. Rated compute is multiplied by its average operating load and facility power factor before conversion to electricity. The 485 terawatt-hour baseline already includes facility overhead. An electricity forecast is never multiplied by that overhead a second time.

Annual new machines, accumulated manufacture and machines still operating are separate quantities. Final losses are applied to cohorts. Service parts keep retained structures productive. The scenario does not retire a complete robot or rack on a fixed five-year schedule.

External factory feed equals finished material divided by net yield after internal scrap reuse. The primary share requires new extraction; the secondary share requires qualified and allocated material. Chemical formulae convert compound grade to elemental grade once. Primary aluminium, recycled aluminium, end-use demand and installed smelter capacity remain separate series.

Substitution and discovery

Enter an alternative cathode or photovoltaic absorber formula, its capacity or conversion performance, density and thickness. The calculator finds the atomic material fractions. That calculation sizes a chosen design. It does not establish a synthesis route, durability or accepted factory output.

Extreme Matter Atlas supplies a path from elements to GNoME, crystals and metamaterials. Its dataset includes estimated properties. The formula engine here uses tabulated atomic masses. Research can change the material or performance assumptions as measurements become available.

Market demand and added project inventories

The default copper path uses S and P Global's January 2026 figures of 28, 33, 38 and 42 million tonnes in 2025, 2030, 2035 and 2040. The main four-sector forecast treats humanoid manufacturing separately. Aluminium uses McKinsey's July 2025 end-use path of 106 million tonnes in 2025 and 130 million in 2035, with its own supply mix described in the paper.

The calculator adds the selected robot batch after subtracting any entered allowance already embedded in the market outlook. Faster data-centre, orbital or generation programmes need their own project inventories and replacement of the relevant market sector allowance. The project ledger helps build that inventory. It should not be added wholesale to a forecast already counting the same equipment.

Explore the changing years

The calculator opens at 2026 and initially plots every year through 2036. Move the year slider, use the planning-horizon buttons or select a point on an annual graph. The chart end can extend to 2040. Selected-year readings, year-by-year tables and CSV downloads use the same calculation engine. Pin current assumptions before changing an input to compare annual paths.

The power plan has a separate completion year. Its additional generation accumulates from zero above the 2025 base using the entered annual construction multiplier, reaches the entered capacities at the plan year and then holds. Protected annual allocations grow linearly to that same year and then hold. These editable paths are scenario assumptions dated 7 November 2026. They are not measured annual additions. Existing 2025 compute electricity remains in the demand base.

The manufacturing programme starts in the entered first production year. Earlier views contain no units from that programme. Population is interpolated at a constant compound rate between June 2025 and the entered population plan year, then extrapolated at that rate. Civic fleet figures size a service requirement. Engineering curves show the current storage, feedstock, orbital or project design inputs; annual topics show the time paths.

Your scenario stays with you

All calculations run in this browser. This site has no account system, analytics or model API. A tab-local scenario carries settings between pages. Download JSON to retain every input, download CSV for results, or copy a link that includes the scenario. Anyone receiving that link can read its inputs. Reset returns to the dated default scenario.

Dates and reproducibility

The research and default assumptions are dated 7 November 2026. Source publication dates appear in the register below. Company targets and proposed rollouts retain their status as dated intentions. Formulas are visible beside the results. The public repository includes automated tests for dimensional conversions, mass balance, survival and protected power allocation.

Project links and credits

Created for Luke Nathan Hayes with Codex. The element dataset is adapted from Extreme Matter Atlas by Luke Nathan Hayes, Strange But True and Aura of Intelligence, an original Luke and Claude project. It is used under its Strange But True Public Source Licence. The site and adapted data retain public source licensing with commercial rights reserved to the author.

Where these projects meet

Dated reference register

  1. US Geological Survey. 2025 estimates; compilation released 6 February 2026 and revised 27 May 2026. Mineral Commodity Summaries 2026: Copper.
  2. US Geological Survey. 2025 estimates; compilation released 6 February 2026 and revised 27 May 2026. Mineral Commodity Summaries 2026: Aluminium.
  3. US Geological Survey. 6 February 2026; version 1.3 dated 27 May 2026. Mineral Commodity Summaries 2026 publication record.
  4. Commission on Isotopic Abundances and Atomic Weights. 2024 table; checked 5 November 2026. Abridged standard atomic weights.
  5. International Energy Agency. 16 April 2026. Key Questions on Energy and AI: executive summary.
  6. SpaceX / SEC. 11 June 2026. Final IPO prospectus.
  7. CRU. 2026 analysis; checked 5 November 2026. Humanoid robots can widen the projected rare earth supply deficit.
  8. Hewlett Packard Enterprise. Undated technical page; checked 5 November 2026. NVIDIA GB200 NVL72 by HPE technical specifications.
  9. NVIDIA. Undated technical documentation; checked 5 November 2026. DGX GB200 hardware documentation.
  10. NASA Goddard Space Flight Center. Undated scientific reference; checked 5 November 2026. Solar irradiance science.
  11. AZUR SPACE. Product page checked 5 November 2026. Space solar cell products.
  12. Iluka Resources. 2 November 2026; construction measured at 30 September 2026. Eneabba rare earths refinery investor site visit.
  13. Northern Territory Government. 2026 project register; checked 5 November 2026. Developing mining projects: Nolans.
  14. Northern Territory Government. 21 May 2026. Nolans final investment decision.
  15. Niron Magnetics. 10 September 2026. Sartell manufacturing site steel raising.
  16. Moog and Niron Magnetics. 2 October 2026. Rare earth free motor technology at AUSA 2026.
  17. International Energy Agency. 2026 report; checked 5 November 2026. Rare earth elements: executive summary.
  18. Google DeepMind. 29 November 2023. GNoME and materials discovery.
  19. Szymanski and colleagues. 29 November 2023; Nature. An autonomous laboratory for accelerated inorganic materials synthesis.
  20. BHP and Microsoft. 30 May 2023. AI assisted copper recovery at Escondida.
  21. Rio Tinto. 15 January 2026. Nuton copper processing and Amazon Web Services collaboration.
  22. Luke Nathan Hayes. Public project page checked 5 November 2026. A Fair Go in the Age of Superintelligence.
  23. National Transport Commission. Report covering January 2025 registrations; news page checked 6 November 2026. Australian light vehicle survival and the January 2025 register.
  24. David L Greene and Benjamin Leard. March 2023 manuscript; Table 1 reproduces 2022 estimates for 2003 and 2020. Trends in scrappage and survival of US light duty vehicles.
  25. University of Birmingham research team. 24 January 2025; reports research published in Nature Energy. Vehicle longevity findings from UK roadworthiness records.
  26. FANUC. Undated corporate service report; checked 6 November 2026. Lifetime maintenance and repair support.
  27. ABB Robotics. Undated service description; checked 6 November 2026. Remanufactured robots and inspection procedure.
  28. Microsoft. 17 April 2025; reports 2024 results. Sustainable by design and component reuse.
  29. Unitree Robotics. Product page checked 6 November 2026. G1 technical specifications.
  30. Unitree Robotics. Product page checked 6 November 2026. H1 technical specifications.
  31. Apptronik. 2023 launch announcement; checked 6 November 2026. Apollo launch specifications.
  32. CRU and Frank Nikolic. 2025 analysis; checked 6 November 2026. The next commodity battleground Humanoid robots.
  33. General Robotics Lab. Team bill dated 19 September 2026; checked 6 November 2026. Duke Humanoid V2 public bill of materials.
  34. Geoscience Australia. 12 October 2026; 2025 production and resources. Australia identified mineral resources 2026 preliminary tables.
  35. Australian Aluminium Council. 2025 production; page checked 7 November 2026. Australian primary aluminium industry.
  36. Tomago Aluminium. Undated company page; checked 7 November 2026. Our story and annual production.
  37. Rio Tinto. 13 July 2018; delivery on 10 July 2018. First autonomous iron ore delivery.
  38. Geoscience Australia. Educational reference checked 7 November 2026. Copper properties.
  39. Geoscience Australia. Educational reference checked 7 November 2026. Aluminium properties and processing.
  40. Australian Government energy statistics. 2026 statistical release; checked 7 November 2026. Electricity generation in 2024 to 2025 and calendar 2025.
  41. International Renewable Energy Agency. March 2026; reports calendar 2025 additions. Renewable capacity statistics 2026.
  42. International Energy Agency. 2026 outlook; checked 7 November 2026. Renewables 2026 renewable electricity outlook.
  43. International Energy Agency. 2026 report; checked 7 November 2026. Global Energy Review 2026 nuclear technology.
  44. International Energy Agency. February 2026 outlook for 2026 to 2030. Electricity 2026 executive summary.
  45. United States President. 20 April 2026. Energy infrastructure determination under the Defense Production Act.
  46. Government of China. 23 July 2026. Renewable energy development plan for 2026 to 2030.
  47. Government of India Press Information Bureau. 9 August 2026; capacity measured 31 July 2026. India reaches 300 gigawatts of non fossil capacity.
  48. European Commission. 22 April 2026 programme and 17 July 2026 electrification plan. AccelerateEU energy resilience programme.
  49. World Bank and African Development Bank. 16 June 2026. Mission 300 progress across Africa.
  50. Australian Department of Climate Change Energy the Environment and Water. Target expanded 29 July 2025; page updated 24 June 2026. Capacity Investment Scheme.
  51. Australian Energy Market Operator. 21 October 2026; September quarter data. Battery projects drive record NEM connections pipeline.
  52. Berkeley Lab and GridTracker. June 2026 report; applications active at 31 December 2025. Queued Up 2026 edition.
  53. National Energy System Operator. 8 December 2025 announcement; checked 7 November 2026. Reformed connections pipeline.
  54. United States Nuclear Regulatory Commission. 2026 regulatory record; checked 7 November 2026. Advanced reactor licensing highlights for 2026.
  55. Commonwealth Fusion Systems. 28 April 2026. First fusion application to the PJM interconnection queue.
  56. Amazon. October 2026 announcement; exact day unavailable on page; checked 7 November 2026. Proposed Indiana nuclear development.
  57. Japan Space Systems. 13 December 2024; tests during December 2024. Long range wireless power flight demonstration.
  58. Aquila Space Technologies. Company project record checked 7 November 2026. Demonstrated laser power transfer and planned Earth to orbit development.
  59. California Institute of Technology. 1 June 2023; experiment began March 2023. Wireless power transmission demonstrated in space.
  60. Luke Nathan Hayes. Public project page checked 7 November 2026. Purple Party for Australia civic workbench.
  61. Lynas Rare Earths. 26 August 2026; year ended 30 June 2026; public copy of issuer report. Appendix 4E and 2026 Annual Report.
  62. Elon Musk. 1 September 2026; ten year operating-fleet prediction. G20 Innovation Ministerial remarks and transcript.
  63. Luke Nathan Hayes. July 2026 concept build; checked 7 November 2026. GAJRA Earth public concept site.
  64. Luke Nathan Hayes and i C infinity. Album link and song titles supplied by the author; referenced 7 November 2026. A Protopian Gambit album and songs.
  65. Tesla SpaceX and xAI. Programme launched 21 March 2026; public page checked 7 November 2026. Terafab public programme and scale targets.
  66. S and P Global Energy and Market Intelligence. 8 January 2026; Figures 1 and 42 and humanoid discussion on pages 48 to 49. Copper in the Age of AI Challenges of Electrification.
  67. McKinsey Energy and Materials Practice. 24 July 2025; outlook for 2025 to 2035, based on Q2 2025 supply pipeline. Cleaning up mixed scrap Decarbonizing aluminum through circularity.
  68. United Nations. 25 September 2015; Goals 6 7 9 11 and 12. Transforming our world the 2030 Agenda for Sustainable Development.
  69. United Nations Statistics Division. 7 July 2026. The Sustainable Development Goals Report 2026.
  70. Waymo. 24 September 2026; company analysis of over 270 million autonomous miles in five US service areas. Safety performance update through June 2026.
  71. Australian Government Centre for Population. Published January 2026; March 2026 corrected report; population at 30 June; rounded figures used here. 2025 Population Statement.
  72. Australian Bureau of Statistics. 18 December 2025; estimated resident population at 30 June 2025. Population up 1 point 5 per cent in June 2025.
  73. Australian Energy Market Operator. 25 August 2026; Step Change demand outlook; pages 28 to 32. 2026 Electricity Statement of Opportunities for the National Electricity Market.
  74. Australian Department of Industry Science and Resources. September 2026 edition; public page checked 7 November 2026; export earnings retain stated real dollar basis. Resources and energy quarterly September 2026.
  75. National Housing Supply and Affordability Council. 21 August 2026; latest data available to 6 August. Quarterly Report August 2026.
  76. Tesla. 22 April 2026; manufacturing section page 6. Q1 2026 update with planned Optimus lines for Fremont and Texas.
  77. Tesla. 21 October 2026; manufacturing and infrastructure sections pages 6 to 7. Q3 2026 update with Fremont early production and Texas construction status.
  78. Tesla. Undated corporate site checked 7 November 2026. Gigafactory Texas factory floor and land area.
  79. Joe Tegtmeyer. 5 November 2026; first-person construction observation; reproduced by an X web viewer; area is an observer report, not a Tesla floor-area disclosure. Optimus factory construction report with more than seven million square feet across multiple levels.
  80. Rider Levett Bucknall. Riders Digest 2026 Queensland edition page 16; rates current fourth quarter 2025; checked 7 November 2026. Australian industrial construction cost ranges and exclusions.
  81. Amazon Australia. 11 March 2026 announcement; intended completion 2028. Queensland robotics fulfilment centre planned at more than A$750 million.
  82. Clean Energy Finance Corporation. Case study updated October 2025; checked 7 November 2026. A$7 million commitment to SwarmFarm and Toowoomba manufacturing.
  83. Australian Renewable Energy Agency. Project starts 12 October 2026 and is scheduled to finish 1 May 2030; checked 7 November 2026. Scaling Sovereign Production of the LUMI Fleet in Melbourne.
  84. Australian Department of Industry Science and Resources. 28 May 2024 strategy; historical revenue observation relates to 2021. Australia's robotics opportunity and existing industrial capability.
  85. Queensland Government. Public manufacturing hub network checked 7 November 2026. Manufacturing hubs and regional industry connections.
  86. Luke Nathan Hayes Sovereign Capacity Lab. 7 November 2026; explicit factory and production assumptions. Build robots in Australia for domestic use and export.
  87. Luke Nathan Hayes. Public design history checked 7 November 2026. Grain by Grain generation city mission.
  88. Aura of Intelligence Luke Nathan Hayes. Public design brief checked 7 November 2026. Subterranean Eco Cities worldwide scope.
  89. Civilisation of Sand Luke Nathan Hayes. Public design workbench checked 7 November 2026. The subterranean city thought experiment.
  90. Micronova and Excursions Luke Nathan Hayes. Public design history checked 7 November 2026. What is being built.
  91. Australian Bureau of Statistics. 17 September 2026 release for 31 March 2026. National state and territory population March 2026.
  92. US Geological Survey. Australian production through 2024 with data available through 24 March 2026. Australia production table including copper processing.
  93. World Steel Association. 2025 annual data updated 28 July 2026 and checked 7 November 2026. Australian crude steel annual production.
  94. Sovereign Capacity Lab prepared for Luke Nathan Hayes. 7 November 2026 requirement tests. Cities for 2045 volume loops power and material calculator.
  95. Australian Aluminium Council. 2025 production figures on corporate industry page checked 7 November 2026. Australian aluminium industry production.
  96. Luke Nathan Hayes Strange But True and Aura of Intelligence. First substantive build 27 August 2026; checked 7 November 2026. Extreme Matter Atlas and its element dataset.
  97. Luke Nathan Hayes. Public site checked 7 November 2026. Joyful Responsible Abundance.
  98. Luke Nathan Hayes. Public proposal checked 7 November 2026. Installing the Missing Middle.
  99. Queensland Government. Games dates checked 7 November 2026. A Games for all of Queensland.
  100. Centre for Population Commonwealth of Australia. 9 January 2026 underlying workbook; population at 30 June. National population projections 2024 to 2025 through 2035 to 2036.