Not for construction / exploratory tender workspace

Compliance matrix

A starting point for tracking tender requirements, ownership, status and open notes.

Matrix status

This is a starting matrix, not a final compliance statement. Owners and status labels should be confirmed before any tender response is lodged.

Open Project Brief coverage audit

Tender requirementSource document / sectionReturnable or deliverableOwnerStatusNotes
Mandatory site inspectionAddendum 1 / ITTAttendance confirmationJointTo confirmConfirm who attends and how attendance is recorded.
Signed addendumAddendum 1Signed addendum returnedTender leadTo confirmMust be returned with tender documents.
Section B Returnable A Form of TenderSection BReturnable AVFGNot startedFormal offer and authorised signature.
B Compliance and DeclarationsSection BReturnable BVFG / JointNeeds infoDeclare full, partial or non-compliance.
C Social ResponsibilitySection BReturnable CJointDraftingLuke can help draft grounded social benefit.
D InsuranceSection BReturnable DVFGNeeds infoCertificates of currency required.
E Licences/certificatesSection BReturnable EVFG / SpecialistNeeds specialistConfirm required licences and specialist evidence.
F Subcontractors/subconsultantsSection BReturnable FVFGNeeds infoIncludes RPEQ/design/survey pathway if subcontracted.
G Local Business and BenefitITT / Section BReturnable GJointDrafting15 percent weighting.
H Tendered Sum and BOQITT / BOQReturnable HVFGNot started30 percent weighting. Keep prices private.
I Proposed Concept DesignITT / Project BriefReturnable IVFG / JointNeeds VFG review10 percent weighting. Concept only until confirmed.
J Company and project team experienceITT / Section BReturnable JVFGNeeds VFG review30 percent weighting with operational capability.
K Program/methodology/cashflowITT / Section BReturnable KVFGNeeds VFG review15 percent weighting.
L QMS/WHSMP/SSEMPITT / Section BReturnable LVFG / SpecialistMandatoryMandatory accreditation systems and management plans.
Stage 1 Structural InvestigationProject BriefProject deliverableVFG / SpecialistNeeds specialistConfirm scope and engineering pathway.
Stage 2 Detailed DesignProject BriefProject deliverableVFG / SpecialistNeeds specialistDesign pathway and review responsibilities.
Stage 3 Permits/ApplicationsProject BriefProject deliverableVFG / SpecialistNeeds specialistIf required by statutory approvals.
Stage 4 Final RPEQ For ConstructionProject BriefCertified drawingsRPEQ / SpecialistNeeds specialistNot Luke-owned.
Pre/post dilapidation surveyProject BriefProject deliverableVFG / SpecialistNeeds infoConfirm timing and responsibility.
Service locatingProject BriefProject deliverableVFG / SpecialistNeeds infoNeeded before serious design/construction.
Safety in DesignProject BriefReportSpecialist / VFGNeeds specialistNeeds qualified design input.
Environmental and koala habitat controlsProject BriefManagement controlsVFG / SpecialistNeeds infoProtect adjacent vegetation and habitat.
As Constructed/ADAC/Form 16Project BriefFinal deliverablesRPEQ / SpecialistNeeds specialistFinal certification pathway.
Defects Liability PeriodContract / Project BriefPost-completion obligationVFGTo confirmCheck contract obligations and risk.