Risks and assumptions

A starter register for the assumptions and risks that should be checked before submission effort ramps up.

Risk register starter

Risk / assumptionWhy it mattersCurrent responseOwner
Drainage and water poolingPhotos show water while the audit recorded no pooling at the inspection time.Verify on site and identify whether it is design, maintenance or both.VFG / Specialist
RPEQ and certification pathwayThe project brief requires certified for-construction and as-constructed deliverables.Confirm consultant pathway before proceeding.VFG / Specialist
BOQ/pricing confidenceTendered sum is heavily weighted and must be credible.Keep pricing private and VFG-led.VFG
Role blurLuke can support drafting but cannot certify, price, engineer or act as contractor.Use role-boundary labels and specialist review gates.Joint
Tender timingReturnables, site inspection, concept design, pricing and evidence may compress quickly.Use the task board and bid/no-bid gate.Joint
Public leakageA public repo could expose tender-sensitive material if unmanaged.Source docs are published intentionally; prices, signatures, filled forms and private details stay out.Luke
Environmental / koala habitat controlsAdjacent vegetation and habitat controls may affect works.Confirm project brief requirements and site constraints.VFG / Specialist